This research project was initiated as a response from the INDOT Pavement Steering Committee related to the joint spacing of Jointed Plain Concrete Pavement in Indiana. There was an initiative in the Committee to reduce the joint spacing from 18 feet to 15 feet as a way to reduce premature concrete pavement deterioration. There was an indication that some newly paved JPCP had transverse cracks even before the pavement section was opened to traffic
This research project was initiated as a response from the INDOT Pavement Steering Committee related to the joint spacing of Jointed Plain Concrete Pavement in Indiana. There was an initiative in the Committee to reduce the joint spacing from 18 feet to 15 feet as a way to reduce premature concrete pavement deterioration. There was an indication that some newly paved JPCP had transverse cracks even before the pavement section was opened to traffic